PM Modi Launches ₹12,200-Crore Thane Integral Ring Metro Rail Project; All You Need To Know About It

Credits: X (Formerly, Twitter)

Mumbai's first underground Metro service, the Aqua Line, opened to the public on Monday.

1st Underground Metro

Credits: X (Formerly, Twitter)

Prime Minister Narendra Modi inaugurated the 12.44 km stretch connecting Bandra-Kurla Complex (BKC) to Aarey Colony JVLR on Saturday.

Aarey Col. To JVLR

Credits: X (Formerly, Twitter)

The complete Mumbai Metro 3 line, also known as the Colaba-Bandra-Seepz line, will be 33.5 km long and has been developed at a cost of over ₹32,000 crore.

Cost Of Construction

Credits: X (Formerly, Twitter)

This stretch includes 10 stations, with nine underground and one at grade level (Aarey).

Mumbai Metro Line 3

Credits: X (Formerly, Twitter)

The Metro will operate 96 daily trips, with each train accommodating over 2,000 passengers and running at a maximum speed of 85 km/h.

Aqua Line Schedule

Credits: X (Formerly, Twitter)

Operating hours are 6:30 to 22:30 on weekdays and 8:30 to 22:30 on weekends, with fares ranging from ₹10 to ₹50.

Metro Line 3 Fare

Credits: X (Formerly, Twitter)

Tickets can be purchased via an app, at physical counters, or using the National Common Mobility Card, which will be valid across all metro lines by next month.

Mobility Card

Credits: X (Formerly, Twitter)

The fully operational Metro line, expected by June 2025, aims to reduce vehicular traffic by up to 6.5 lakh trips.

Fully Operational

Credits: X (Formerly, Twitter)

Will you travel on the line soon?

Credits: X (Formerly, Twitter)